Close Menu
C-News
  • News
    • World
  • Politics
  • Business
    • Technology
    • Careers
  • Lifestyle
    • Entertainment
    • Travel
  • World News
  • Sports

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

PAYE Has Changed — What Are You Owed?

September 17, 2026

MTN Takes Digital Push East as Zawedde Bets on Youth

September 16, 2026

UEDCL rewires western grid to cut losses and power new factories

September 4, 2026
Facebook X (Twitter) Instagram
Trending
  • PAYE Has Changed — What Are You Owed?
  • MTN Takes Digital Push East as Zawedde Bets on Youth
  • UEDCL rewires western grid to cut losses and power new factories
  • Why Uganda Wants Tourists to Taste Coffee at the Roots
  • Uganda Doesn’t Need a Miracle to Turn into Singapore. It Needs Discipline
  • Here’s The Missing Link in Uganda’s Electric Vehicle Revolution
  • Why Uganda’s electric vehicle revolution is slowing down
  • UETCL, UEDCL: Kampala’s Blackouts May Soon Be History
X (Twitter)
C-News
  • News
    • World
  • Politics
  • Business
    • Technology
    • Careers
  • Lifestyle
    • Entertainment
    • Travel
  • World News
  • Sports
C-News
Home»News»400kv power deal revs up Uganda, South Sudan trade relations
News

400kv power deal revs up Uganda, South Sudan trade relations

By Chief EditorJune 28, 2023No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Irene Bateebe (Left), the Permanent Secretary of the Ministry of Energy and Beck Awan Deng, the General Manager of the South Sudan Electricity Cooperation (SSEC), signed on behalf of his country.
Share
Facebook Twitter LinkedIn Pinterest Email

KAMPALA – Uganda and South Sudan have taken a significant step toward enhancing power trade and fostering socio-economic development with the signing of a Power Sales Agreement (PSA) between the two countries. The agreement, executed on June 27, aims to prioritize the development of a 308-kilometer power transmission line, connecting the towns of Olwiyo in Uganda and Juba in South Sudan.

The agreement is a result of the commitment made in a Memorandum of Understanding signed in December 2015, which aimed to develop transmission and distribution infrastructure between Uganda and South Sudan. The implementation of the PSA seeks to strengthen the bond between the two nations and facilitate power exchange, benefiting border towns such as Oraba, Elegu, Kaya, and Nimule.

The 400kV Olwiyo-Juba Power Transmission Line, spanning 308 kilometers, will be instrumental in enabling power transfer between Uganda and South Sudan. The transmission line will extend 138 kilometers in Uganda and 170 kilometers in South Sudan. Additionally, the Olwiyo and Bibia substations in Uganda, along with the Juba Substation in South Sudan, will undergo expansion to support the increased power flow.

The delegation from Uganda, led by Dr. Ruth Nankabirwa Ssentamu, the Minister of Energy and Mineral Development, traveled to Juba to execute the agreement. Representing the South Sudanese government was Mr. Peter Marcello Jelenge. The PSA was signed on behalf of Uganda by Ms. Irene Bateebe, the Permanent Secretary of the Ministry of Energy, while Mr. Beck Awan Deng, the General Manager of the South Sudan Electricity Cooperation (SSEC), signed on behalf of his country.

Dr. Nankabirwa expressed her optimism about the agreement, stating, “Today’s signing ceremony marks the beginning of serious cooperation in power trade between Uganda and South Sudan.” She emphasized the importance of projects that benefit both countries, highlighting that power would be supplied to small towns in Uganda, such as Elegu and Oraba, while border towns in South Sudan, including Nimule and Kaya, would receive power from Uganda.

The project has made significant progress toward its implementation:

  1. The Olwiyo Substation, operational at 132kV, will serve as the starting point for the 400kV Olwiyo-Juba Transmission Line.
  2. The Nile Equatorial Lakes Subsidiary Action Plan (NELSAP) has been entrusted with coordinating the joint development of the transmission line as per the MoU.
  3. A Joint Technical Committee has been established to plan and coordinate the project’s development.
  4. Funds for feasibility studies have been secured from the African Development Bank (AfDB), which may also finance the project based on the outcome of the feasibility study, either through an Engineering, Procurement, and Construction (EPC) contract or a Public Private Partnership (PPP) model.
  5. The feasibility study has been awarded to a consortium comprising CESI S.p.A (Italy), ELC Electroconsult S.p.A. (Italy), and Colenco Consulting Ltd (Nigeria). The study commenced in March 2023 and is expected to be completed by February 2024.
  6. Collaboration between the two countries extends to the power distribution segment, with distribution networks already established in the Uganda-South Sudan border towns of Nimule and Kaya.

This increased cooperation in power trade and infrastructure development is expected to bolster regional productivity, promote socio-economic growth, and contribute to the security and stability of border towns in both Uganda and South Sudan.

 

@ministry of Finance @nrmonline @ramathan Ggoobi ministry of Energy
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Chief Editor
  • Website

Related Posts

MTN Takes Digital Push East as Zawedde Bets on Youth

September 16, 2026

UEDCL rewires western grid to cut losses and power new factories

September 4, 2026

Here’s The Missing Link in Uganda’s Electric Vehicle Revolution

August 5, 2026
Top Posts

Opening Ceremony FIFA World Cup Qatar 2022

November 21, 2022

Musk lifts Donald Trump’s Twitter ban after a poll

November 23, 2022

Angry protests at giant iPhone factory in Zhengzhou

November 26, 2022

Protesters openly urge Xi to resign over China Covid curbs

November 27, 2022
Don't Miss
Business

PAYE Has Changed — What Are You Owed?

By JOSHUA KATO, CA.September 17, 20260

Uganda’s new PAYE rates took effect on July 1, 2026, meaning some workers may have been overtaxed in July and August. Here is how the new bands work, who may be owed money and what employers must do to correct affected payrolls.

MTN Takes Digital Push East as Zawedde Bets on Youth

September 16, 2026

UEDCL rewires western grid to cut losses and power new factories

September 4, 2026

Why Uganda Wants Tourists to Taste Coffee at the Roots

August 25, 2026
Stay In Touch
  • Twitter

Subscribe to Updates

Get the latest news from c-news!

Demo
About Us
About Us

C-News is your source of the latest general news, business, health, travel and politics as it breaks in Uganda and East Africa.

Reports, Analysis, Pictorial and Videos.

Email Us: info@c-news.ug
Contact: +256 776745120

X (Twitter)
Our Picks

PAYE Has Changed — What Are You Owed?

September 17, 2026

MTN Takes Digital Push East as Zawedde Bets on Youth

September 16, 2026

UEDCL rewires western grid to cut losses and power new factories

September 4, 2026
Most Popular

Opening Ceremony FIFA World Cup Qatar 2022

November 21, 2022

Musk lifts Donald Trump’s Twitter ban after a poll

November 23, 2022

Angry protests at giant iPhone factory in Zhengzhou

November 26, 2022
  • Home
  • Privacy Policy
© C-NEWS 2026

Type above and press Enter to search. Press Esc to cancel.